Solar power plant · Navarro, TX

Gaia Hybrid

Gaia Hybrid is a 230 MW solar power plant in Navarro County, Texas, operated by Sunraycer Assets I LLC. Its oldest generator still running came online in 2026.

Capacity230 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators2Oldest from 2026

Gaia Hybrid in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 64th largest, about 0.6% of the state's 37 GW of solar capacity.

Navarro County has 6 power plants of 1 MW or more with 1.2 GW in all; Gaia Hybrid is 19% of that and the 3rd largest of 4 solar plants there.

The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Gaia Hybrid (outlined) and other plants in Navarro County, shaded. 32.161, -96.195.

Plant facts

Operator
Sunraycer Assets I LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Navarro County, TX
EIA plant ID
66342
  • Solar153 MW67%
  • Storage77 MW33%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GAIAS Solar Photovoltaic 153 MW 2026 –
GAIAB Batteries 77 MW · 307 MWh 2026 –

Questions

Gaia Hybrid, answered

How much power does Gaia Hybrid produce?

Gaia Hybrid has 230 MW of capacity from 2 generators. No full year of generation is reported yet.

Where is Gaia Hybrid?

Gaia Hybrid is in Navarro County, Texas, at about 32.161°, -96.195°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Gaia Hybrid?

It is operated by Sunraycer Assets I LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Gaia Hybrid open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.