Fence Post Solar Hybrid Project, LLC is a 308 MW solar power plant in Navarro County, Texas, operated by Fence Post Solar Project, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 524 GWh, about what 39,000 average Texas homes use in a year.

Capacity308 MWNameplate, September 2026
Generated524 GWhIn 2025
Capacity factor19%Share of the most it could make, 2025
Generators2Oldest from 2024

Fence Post Solar Hybrid Project, LLC in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 29th largest, about 0.8% of the state's 37 GW of solar capacity.

Navarro County has 6 power plants of 1 MW or more with 1.2 GW in all; Fence Post Solar Hybrid Project, LLC is 25% of that and the largest of 4 solar plants there.

Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060020242025GWh 524
020040060020242025524

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Fence Post Solar Hybrid Project, LLC (outlined) and other plants in Navarro County, shaded. 32.073, -96.224.

Plant facts

Operator
Fence Post Solar Project, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Navarro County, TX
EIA plant ID
66801
  • Solar236 MW77%
  • Storage72 MW23%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FNCPT Solar Photovoltaic 236 MW 2024 –
FNCBE Batteries 72 MW · 115 MWh 2024 –

Questions

Fence Post Solar Hybrid Project, LLC, answered

How much power does Fence Post Solar Hybrid Project, LLC produce?

Fence Post Solar Hybrid Project, LLC has 308 MW of capacity from 2 generators. In 2025 it generated 524 GWh, 19% of the most it could have made running flat out all year (its capacity factor).

How many homes does Fence Post Solar Hybrid Project, LLC power?

Its 2025 output of 524 GWh equals the yearly electricity use of about 39,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Fence Post Solar Hybrid Project, LLC?

Fence Post Solar Hybrid Project, LLC is in Navarro County, Texas, at about 32.073°, -96.224°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Fence Post Solar Hybrid Project, LLC?

It is operated by Fence Post Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Fence Post Solar Hybrid Project, LLC open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.