Wind power plant · Navarro, TX

Limestone Wind Project

Limestone Wind Project is a 299 MW wind power plant in Navarro County, Texas, operated by Limestone Wind Project, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 1.0 TWh, about what 78,000 average Texas homes use in a year.

Capacity299 MWNameplate, September 2026
Generated1.0 TWhIn 2025
Capacity factor40%Share of the most it could make, 2025
Generators1Oldest from 2022

Limestone Wind Project in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 36th largest, about 0.7% of the state's 45 GW of wind capacity.

Navarro County has 6 power plants of 1 MW or more with 1.2 GW in all; Limestone Wind Project is 25% of that.

Its capacity factor of 40% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0001,2002022202320242025GWh 1,044
02004006008001,0001,20020222023202420251,044

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Limestone Wind Project (outlined) and other plants in Navarro County, shaded. 31.853, -96.624.

Plant facts

Operator
Limestone Wind Project, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Navarro County, TX
EIA plant ID
65306
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LIMEW Onshore Wind Turbine 299 MW 2022 –

Questions

Limestone Wind Project, answered

How much power does Limestone Wind Project produce?

Limestone Wind Project has 299 MW of capacity from one generator. In 2025 it generated 1.0 TWh, 40% of the most it could have made running flat out all year (its capacity factor).

How many homes does Limestone Wind Project power?

Its 2025 output of 1.0 TWh equals the yearly electricity use of about 78,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Limestone Wind Project?

Limestone Wind Project is in Navarro County, Texas, at about 31.853°, -96.624°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Limestone Wind Project?

It is operated by Limestone Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Limestone Wind Project open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.