Wind power plant · Navarro, TX
Limestone Wind Project
Limestone Wind Project is a 299 MW wind power plant in Navarro County, Texas, operated by Limestone Wind Project, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 1.0 TWh, about what 78,000 average Texas homes use in a year.
Limestone Wind Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 36th largest, about 0.7% of the state's 45 GW of wind capacity.
Navarro County has 6 power plants of 1 MW or more with 1.2 GW in all; Limestone Wind Project is 25% of that.
Its capacity factor of 40% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Limestone Wind Project (outlined) and other plants in Navarro County, shaded. 31.853, -96.624.
Plant facts
- Operator
- Limestone Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Navarro County, TX
- EIA plant ID
- 65306
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LIMEW | Onshore Wind Turbine | 299 MW | 2022 | – |
Nearby
Other plants in Navarro County
Questions
Limestone Wind Project, answered
How much power does Limestone Wind Project produce?
Limestone Wind Project has 299 MW of capacity from one generator. In 2025 it generated 1.0 TWh, 40% of the most it could have made running flat out all year (its capacity factor).
How many homes does Limestone Wind Project power?
Its 2025 output of 1.0 TWh equals the yearly electricity use of about 78,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Limestone Wind Project?
Limestone Wind Project is in Navarro County, Texas, at about 31.853°, -96.624°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Limestone Wind Project?
It is operated by Limestone Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Limestone Wind Project open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.