Solar power plant · Upton, TX
Castle Gap Solar Hybrid
Castle Gap Solar Hybrid is a 190 MW solar power plant in Upton County, Texas, operated by Upton County Solar 2 LLC. Its oldest generator still running came online in 2018. In 2025 it generated 384 GWh, about what 29,000 average Texas homes use in a year.
Castle Gap Solar Hybrid in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 97th largest, about 0.5% of the state's 37 GW of solar capacity.
Upton County has 8 power plants of 1 MW or more with 2.0 GW in all; Castle Gap Solar Hybrid is 9% of that and the 2nd largest of 4 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Upton County goes 15 hours a year without power, the 73rd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Castle Gap Solar Hybrid (outlined) and other plants in Upton County, shaded. 31.255, -102.272.
Plant facts
- Operator
- Upton County Solar 2 LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Upton County, TX
- EIA plant ID
- 60123
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CGAP | Solar Photovoltaic | 180 MW | 2018 | – |
| BAT1 | Batteries | 9.9 MW · 42 MWh | 2019 | – |
Questions
Castle Gap Solar Hybrid, answered
How much power does Castle Gap Solar Hybrid produce?
Castle Gap Solar Hybrid has 190 MW of capacity from 2 generators. In 2025 it generated 384 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Castle Gap Solar Hybrid power?
Its 2025 output of 384 GWh equals the yearly electricity use of about 29,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Castle Gap Solar Hybrid?
Castle Gap Solar Hybrid is in Upton County, Texas, at about 31.255°, -102.272°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Upton County goes 15 hours a year without power, the 73rd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Castle Gap Solar Hybrid?
It is operated by Upton County Solar 2 LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Castle Gap Solar Hybrid open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.