Solar power plant · Upton, TX

King Mountain Solar

King Mountain Solar is a 175 MW solar power plant in Upton County, Texas, operated by King Mountain Solar, LLC. Its oldest generator still running came online in 2026.

Capacity175 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

King Mountain Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 102nd largest, about 0.5% of the state's 37 GW of solar capacity.

Upton County has 8 power plants of 1 MW or more with 2.0 GW in all; King Mountain Solar is 9% of that and the 3rd largest of 4 solar plants there.

The average electricity customer in Upton County goes 15 hours a year without power, the 73rd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

King Mountain Solar (outlined) and other plants in Upton County, shaded. 31.236, -102.123.

Plant facts

Operator
King Mountain Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Upton County, TX
EIA plant ID
69755
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
5568 Solar Photovoltaic 175 MW 2026 –

Questions

King Mountain Solar, answered

How much power does King Mountain Solar produce?

King Mountain Solar has 175 MW of capacity from one generator. No full year of generation is reported yet.

Where is King Mountain Solar?

King Mountain Solar is in Upton County, Texas, at about 31.236°, -102.123°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Upton County goes 15 hours a year without power, the 73rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates King Mountain Solar?

It is operated by King Mountain Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did King Mountain Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.