Solar power plant · Upton, TX

Roadrunner, LLC Hybrid

Roadrunner, LLC Hybrid is a 463 MW solar power plant in Upton County, Texas, operated by Roadrunner Solar, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 1.1 TWh, about what 81,000 average Texas homes use in a year.

Capacity463 MWNameplate, September 2026
Generated1.1 TWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators3Oldest from 2019

Roadrunner, LLC Hybrid in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 13th largest, about 1.2% of the state's 37 GW of solar capacity.

Upton County has 8 power plants of 1 MW or more with 2.0 GW in all; Roadrunner, LLC Hybrid is 23% of that and the largest of 4 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Upton County goes 15 hours a year without power, the 73rd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0001,200202020212022202320242025GWh 1,080
02004006008001,0001,2002020202120222023202420251,080

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Roadrunner, LLC Hybrid (outlined) and other plants in Upton County, shaded. 31.219, -102.192.

Plant facts

Operator
Roadrunner Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Upton County, TX
EIA plant ID
62561
  • Solar400 MW86%
  • Storage63 MW14%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RODR1 Solar Photovoltaic 200 MW 2019 –
RODR2 Solar Photovoltaic 200 MW 2020 –
BA Batteries 63 MW · 109 MWh 2023 –

Questions

Roadrunner, LLC Hybrid, answered

How much power does Roadrunner, LLC Hybrid produce?

Roadrunner, LLC Hybrid has 463 MW of capacity from 3 generators. In 2025 it generated 1.1 TWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Roadrunner, LLC Hybrid power?

Its 2025 output of 1.1 TWh equals the yearly electricity use of about 81,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Roadrunner, LLC Hybrid?

Roadrunner, LLC Hybrid is in Upton County, Texas, at about 31.219°, -102.192°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Upton County goes 15 hours a year without power, the 73rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Roadrunner, LLC Hybrid?

It is operated by Roadrunner Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Roadrunner, LLC Hybrid open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.