Solar power plant · Cooke, TX

Compadre Solar

Compadre Solar is a 150 MW solar power plant in Cooke County, Texas, operated by Compadre Solar, LLC. Its oldest generator still running came online in 2026.

Capacity150 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Compadre Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 114th largest, about 0.4% of the state's 37 GW of solar capacity.

Cooke County has 7 power plants of 1 MW or more with 638 MW in all; Compadre Solar is 24% of that and the largest of 3 solar plants there.

The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Compadre Solar (outlined) and other plants in Cooke County, shaded. 33.457, -97.290.

Plant facts

Operator
Compadre Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Cooke County, TX
EIA plant ID
67765
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
5191 Solar Photovoltaic 150 MW 2026 –

Nearby

Other plants in Cooke County

Questions

Compadre Solar, answered

How much power does Compadre Solar produce?

Compadre Solar has 150 MW of capacity from one generator. No full year of generation is reported yet.

Where is Compadre Solar?

Compadre Solar is in Cooke County, Texas, at about 33.457°, -97.290°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Compadre Solar?

It is operated by Compadre Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Compadre Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.