Wind power plant · Cooke, TX
Wildcat Creek Wind Farm LLC
Wildcat Creek Wind Farm LLC is a 175 MW wind power plant in Cooke County, Texas, operated by Wildcat Creek Wind Farm LLC. Its oldest generator still running came online in 2021. In 2025 it generated 447 GWh, about what 34,000 average Texas homes use in a year.
Wildcat Creek Wind Farm LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 125th largest, about 0.4% of the state's 45 GW of wind capacity.
Cooke County has 7 power plants of 1 MW or more with 638 MW in all; Wildcat Creek Wind Farm LLC is 27% of that and the largest of 3 wind plants there.
Its capacity factor of 29% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wildcat Creek Wind Farm LLC (outlined) and other plants in Cooke County, shaded. 33.549, -97.330.
Plant facts
- Operator
- Wildcat Creek Wind Farm LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Cooke County, TX
- EIA plant ID
- 62715
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WCCWF | Onshore Wind Turbine | 175 MW | 2021 | – |
Nearby
Other plants in Cooke County
Questions
Wildcat Creek Wind Farm LLC, answered
How much power does Wildcat Creek Wind Farm LLC produce?
Wildcat Creek Wind Farm LLC has 175 MW of capacity from one generator. In 2025 it generated 447 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wildcat Creek Wind Farm LLC power?
Its 2025 output of 447 GWh equals the yearly electricity use of about 34,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wildcat Creek Wind Farm LLC?
Wildcat Creek Wind Farm LLC is in Cooke County, Texas, at about 33.549°, -97.330°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Wildcat Creek Wind Farm LLC?
It is operated by Wildcat Creek Wind Farm LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Wildcat Creek Wind Farm LLC open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.