Wind power plant · Cooke, TX
Wolf Ridge Wind
Wolf Ridge Wind is a 113 MW wind power plant in Cooke County, Texas, operated by NextEra Wolf Ridge LLC. Its oldest generator still running came online in 2008. In 2025 it generated 355 GWh, about what 27,000 average Texas homes use in a year.
Wolf Ridge Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 184th largest, about 0.3% of the state's 45 GW of wind capacity.
Cooke County has 7 power plants of 1 MW or more with 638 MW in all; Wolf Ridge Wind is 18% of that and the 3rd largest of 3 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wolf Ridge Wind (outlined) and other plants in Cooke County, shaded. 33.733, -97.428.
Plant facts
- Operator
- NextEra Wolf Ridge LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Cooke County, TX
- EIA plant ID
- 58080
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 113 MW | 2008 | – |
Nearby
Other plants in Cooke County
Questions
Wolf Ridge Wind, answered
How much power does Wolf Ridge Wind produce?
Wolf Ridge Wind has 113 MW of capacity from one generator. In 2025 it generated 355 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wolf Ridge Wind power?
Its 2025 output of 355 GWh equals the yearly electricity use of about 27,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wolf Ridge Wind?
Wolf Ridge Wind is in Cooke County, Texas, at about 33.733°, -97.428°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Wolf Ridge Wind?
It is operated by NextEra Wolf Ridge LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Wolf Ridge Wind open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.