Wind power plant · Cooke, TX
Tyler Bluff Wind Project, LLC
Tyler Bluff Wind Project, LLC is a 126 MW wind power plant in Cooke County, Texas, operated by Southern Power Co. Its oldest generator still running came online in 2016. In 2025 it generated 332 GWh, about what 25,000 average Texas homes use in a year.
Tyler Bluff Wind Project, LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 172nd largest, about 0.3% of the state's 45 GW of wind capacity.
Cooke County has 7 power plants of 1 MW or more with 638 MW in all; Tyler Bluff Wind Project, LLC is 20% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tyler Bluff Wind Project, LLC (outlined) and other plants in Cooke County, shaded. 33.704, -97.372.
Plant facts
- Operator
- Southern Power Co
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Cooke County, TX
- EIA plant ID
- 60502
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 126 MW | 2016 | – |
Nearby
Other plants in Cooke County
Questions
Tyler Bluff Wind Project, LLC, answered
How much power does Tyler Bluff Wind Project, LLC produce?
Tyler Bluff Wind Project, LLC has 126 MW of capacity from one generator. In 2025 it generated 332 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tyler Bluff Wind Project, LLC power?
Its 2025 output of 332 GWh equals the yearly electricity use of about 25,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tyler Bluff Wind Project, LLC?
Tyler Bluff Wind Project, LLC is in Cooke County, Texas, at about 33.704°, -97.372°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Cooke County goes 13 hours a year without power, the 88th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Tyler Bluff Wind Project, LLC?
It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Tyler Bluff Wind Project, LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.