Storage power plant · Pecos, TX
Dogfish BESS
Dogfish BESS is a 75 MW storage power plant in Pecos County, Texas, operated by Dogfish ESS Assets, LLC. Its oldest generator still running came online in 2025.
Dogfish BESS in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 86th largest, about 0.5% of the state's 16 GW of storage capacity.
Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Dogfish BESS is 2% of that and the 7th largest of 12 storage plants there.
The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Dogfish BESS (outlined) and other plants in Pecos County, shaded. 30.919, -102.850.
Plant facts
- Operator
- Dogfish ESS Assets, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Pecos County, TX
- EIA plant ID
- 69407
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 3008 | Batteries | 75 MW · 75 MWh | 2025 | – |
Questions
Dogfish BESS, answered
How much can Dogfish BESS store and deliver?
Dogfish BESS can deliver up to 75 MW and hold 75 MWh of energy, from one battery or storage system. Its net energy in 2025 was -5.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Dogfish BESS?
Dogfish BESS is in Pecos County, Texas, at about 30.919°, -102.850°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Dogfish BESS?
It is operated by Dogfish ESS Assets, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Dogfish BESS open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.