Solar power plant · Hillsborough, FL
Dover Solar and Battery Storage
Dover Solar and Battery Storage is a 40 MW solar power plant in Hillsborough County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2023. In 2025 it generated 47 GWh, about what 3,600 average Florida homes use in a year.
Dover Solar and Battery Storage in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 181st largest, about 0.3% of the state's 14 GW of solar capacity.
Hillsborough County has 25 power plants of 1 MW or more with 5.1 GW in all; Dover Solar and Battery Storage is 1% of that and the 11th largest of 17 solar plants there.
Its capacity factor of 13% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Dover Solar and Battery Storage (outlined) and other plants in Hillsborough County, shaded. 27.956, -82.201.
Plant facts
- Operator
- Tampa Electric Co
- Sector
- Electric Utility
- Grid operator
- TEC
- County
- Hillsborough County, FL
- EIA plant ID
- 66129
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 25 MW | 2023 | – |
| BESS1 | Batteries | 15 MW · 30 MWh | 2024 | – |
Questions
Dover Solar and Battery Storage, answered
How much power does Dover Solar and Battery Storage produce?
Dover Solar and Battery Storage has 40 MW of capacity from 2 generators. In 2025 it generated 47 GWh, 13% of the most it could have made running flat out all year (its capacity factor).
How many homes does Dover Solar and Battery Storage power?
Its 2025 output of 47 GWh equals the yearly electricity use of about 3,600 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Dover Solar and Battery Storage?
Dover Solar and Battery Storage is in Hillsborough County, Florida, at about 27.956°, -82.201°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Dover Solar and Battery Storage?
It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.
When did Dover Solar and Battery Storage open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.