Solar power plant · Pecos, TX
Emerald Grove
Emerald Grove is a 108 MW solar power plant in Pecos County, Texas, operated by Luminant Generation Company LLC. Its oldest generator still running came online in 2023. In 2025 it generated 256 GWh, about what 19,000 average Texas homes use in a year.
Emerald Grove in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 138th largest, about 0.3% of the state's 37 GW of solar capacity.
Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Emerald Grove is 3% of that and the 10th largest of 13 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Emerald Grove (outlined) and other plants in Pecos County, shaded. 31.093, -102.360.
Plant facts
- Operator
- Luminant Generation Company LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Pecos County, TX
- EIA plant ID
- 63233
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| UNIT1 | Solar Photovoltaic | 108 MW | 2023 | – |
Questions
Emerald Grove, answered
How much power does Emerald Grove produce?
Emerald Grove has 108 MW of capacity from one generator. In 2025 it generated 256 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Emerald Grove power?
Its 2025 output of 256 GWh equals the yearly electricity use of about 19,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Emerald Grove?
Emerald Grove is in Pecos County, Texas, at about 31.093°, -102.360°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Emerald Grove?
It is operated by Luminant Generation Company LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Emerald Grove open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.