Solar power plant · Borden, TX
ENGIE Long Draw Solar LLC
ENGIE Long Draw Solar LLC is a 225 MW solar power plant in Borden County, Texas, operated by Engie North America. Its oldest generator still running came online in 2020. In 2025 it generated 519 GWh, about what 39,000 average Texas homes use in a year.
ENGIE Long Draw Solar LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 66th largest, about 0.6% of the state's 37 GW of solar capacity.
Borden County has 7 power plants of 1 MW or more with 1.5 GW in all; ENGIE Long Draw Solar LLC is 15% of that and the 2nd largest of 2 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Borden County goes 33 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
ENGIE Long Draw Solar LLC (outlined) and other plants in Borden County, shaded. 32.741, -101.622.
Plant facts
- Operator
- Engie North America
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Borden County, TX
- EIA plant ID
- 62845
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SP1 | Solar Photovoltaic | 225 MW | 2020 | – |
Questions
ENGIE Long Draw Solar LLC, answered
How much power does ENGIE Long Draw Solar LLC produce?
ENGIE Long Draw Solar LLC has 225 MW of capacity from one generator. In 2025 it generated 519 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does ENGIE Long Draw Solar LLC power?
Its 2025 output of 519 GWh equals the yearly electricity use of about 39,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is ENGIE Long Draw Solar LLC?
ENGIE Long Draw Solar LLC is in Borden County, Texas, at about 32.741°, -101.622°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Borden County goes 33 hours a year without power. The county's page has the full outage record.
Who operates ENGIE Long Draw Solar LLC?
It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did ENGIE Long Draw Solar LLC open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.