Solar power plant · Borden, TX
Juno Solar Project
Juno Solar Project is a 306 MW solar power plant in Borden County, Texas, operated by SE Juno, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 767 GWh, about what 58,000 average Texas homes use in a year.
Juno Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 31st largest, about 0.8% of the state's 37 GW of solar capacity.
Borden County has 7 power plants of 1 MW or more with 1.5 GW in all; Juno Solar Project is 21% of that and the largest of 2 solar plants there.
Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Borden County goes 33 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Juno Solar Project (outlined) and other plants in Borden County, shaded. 32.773, -101.391.
Plant facts
- Operator
- SE Juno, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Borden County, TX
- EIA plant ID
- 63328
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| JUNO1 | Solar Photovoltaic | 162 MW | 2021 | – |
| IPJNO | Solar Photovoltaic | 144 MW | 2021 | – |
Questions
Juno Solar Project, answered
How much power does Juno Solar Project produce?
Juno Solar Project has 306 MW of capacity from 2 generators. In 2025 it generated 767 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Juno Solar Project power?
Its 2025 output of 767 GWh equals the yearly electricity use of about 58,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Juno Solar Project?
Juno Solar Project is in Borden County, Texas, at about 32.773°, -101.391°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Borden County goes 33 hours a year without power. The county's page has the full outage record.
Who operates Juno Solar Project?
It is operated by SE Juno, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Juno Solar Project open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.