Wind power plant · Borden, TX
Post Wind Farm LP
Post Wind Farm LP is a 84 MW wind power plant in Borden County, Texas, operated by FPL Energy Red Canyon LLC. Its oldest generator still running came online in 2006. In 2025 it generated 312 GWh, about what 23,000 average Texas homes use in a year.
Post Wind Farm LP in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 195th largest, about 0.2% of the state's 45 GW of wind capacity.
Borden County has 7 power plants of 1 MW or more with 1.5 GW in all; Post Wind Farm LP is 6% of that and the 4th largest of 4 wind plants there.
Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Borden County goes 33 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Post Wind Farm LP (outlined) and other plants in Borden County, shaded. 32.925, -101.219.
Plant facts
- Operator
- FPL Energy Red Canyon LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Borden County, TX
- EIA plant ID
- 56457
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 84 MW | 2006 | – |
Questions
Post Wind Farm LP, answered
How much power does Post Wind Farm LP produce?
Post Wind Farm LP has 84 MW of capacity from one generator. In 2025 it generated 312 GWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Post Wind Farm LP power?
Its 2025 output of 312 GWh equals the yearly electricity use of about 23,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Post Wind Farm LP?
Post Wind Farm LP is in Borden County, Texas, at about 32.925°, -101.219°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Borden County goes 33 hours a year without power. The county's page has the full outage record.
Who operates Post Wind Farm LP?
It is operated by FPL Energy Red Canyon LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Post Wind Farm LP open?
Its oldest generator still running came online in 2006.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.