Solar power plant · Hillsborough, FL

English Creek Solar

English Creek Solar is a 23 MW solar power plant in Hillsborough County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2024. In 2025 it generated 53 GWh, about what 4,000 average Florida homes use in a year.

Capacity23 MWNameplate, September 2026
Generated53 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2024

English Creek Solar in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 186th largest, about 0.2% of the state's 14 GW of solar capacity.

Hillsborough County has 25 power plants of 1 MW or more with 5.1 GW in all; English Creek Solar is 0% of that and the 13th largest of 17 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406020242025GWh 53
02040602024202553

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

English Creek Solar (outlined) and other plants in Hillsborough County, shaded. 27.946, -82.067.

Plant facts

Operator
Tampa Electric Co
Sector
Electric Utility
Grid operator
TEC
County
Hillsborough County, FL
EIA plant ID
66921
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 23 MW 2024 –

Questions

English Creek Solar, answered

How much power does English Creek Solar produce?

English Creek Solar has 23 MW of capacity from one generator. In 2025 it generated 53 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does English Creek Solar power?

Its 2025 output of 53 GWh equals the yearly electricity use of about 4,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is English Creek Solar?

English Creek Solar is in Hillsborough County, Florida, at about 27.946°, -82.067°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.

Who operates English Creek Solar?

It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.

When did English Creek Solar open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.