Storage power plant · Pecos, TX

Fort Stockton Clean Energy Center (BESS)

Fort Stockton Clean Energy Center (BESS) is a 10 MW storage power plant in Pecos County, Texas, operated by On Energy Storage. Its oldest generator still running came online in 2026.

Capacity10 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Fort Stockton Clean Energy Center (BESS) in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 114th largest, about 0.1% of the state's 16 GW of storage capacity.

Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Fort Stockton Clean Energy Center (BESS) is 0% of that and the 9th largest of 12 storage plants there.

The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Fort Stockton Clean Energy Center (BESS) (outlined) and other plants in Pecos County, shaded. 30.891, -102.883.

Plant facts

Operator
On Energy Storage
Sector
IPP Non-CHP
Grid operator
ERCO
County
Pecos County, TX
EIA plant ID
69455
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FSBA1 Batteries 10 MW · 20 MWh 2026 –

Questions

Fort Stockton Clean Energy Center (BESS), answered

How much can Fort Stockton Clean Energy Center (BESS) store and deliver?

Fort Stockton Clean Energy Center (BESS) can deliver up to 10 MW and hold 20 MWh of energy, from one battery or storage system.

Where is Fort Stockton Clean Energy Center (BESS)?

Fort Stockton Clean Energy Center (BESS) is in Pecos County, Texas, at about 30.891°, -102.883°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Fort Stockton Clean Energy Center (BESS)?

It is operated by On Energy Storage (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Fort Stockton Clean Energy Center (BESS) open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.