Storage power plant · Pecos, TX
Headcamp BESS
Headcamp BESS is a 150 MW storage power plant in Pecos County, Texas, operated by Lydian Energy. Its oldest generator still running came online in 2026.
Headcamp BESS in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 48th largest, about 0.9% of the state's 16 GW of storage capacity.
Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Headcamp BESS is 4% of that and the 4th largest of 12 storage plants there.
The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Headcamp BESS (outlined) and other plants in Pecos County, shaded. 30.916, -102.855.
Plant facts
- Operator
- Lydian Energy
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Pecos County, TX
- EIA plant ID
- 68580
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MHB | Batteries | 150 MW · 300 MWh | 2026 | – |
Questions
Headcamp BESS, answered
How much can Headcamp BESS store and deliver?
Headcamp BESS can deliver up to 150 MW and hold 300 MWh of energy, from one battery or storage system.
Where is Headcamp BESS?
Headcamp BESS is in Pecos County, Texas, at about 30.916°, -102.855°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Headcamp BESS?
It is operated by Lydian Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Headcamp BESS open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.