Solar power plant · Yuma, AZ

Hyder Solar Hybrid

Hyder Solar Hybrid is a 48 MW solar power plant in Yuma County, Arizona, operated by Arizona Public Service Co. Its oldest generator still running came online in 2011. In 2025 it generated 31 GWh, about what 2,500 average Arizona homes use in a year.

Capacity48 MWNameplate, September 2026
Generated31 GWhIn 2025
Capacity factor7%Share of the most it could make, 2025
Generators3Oldest from 2011

Hyder Solar Hybrid in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 43rd largest, about 0.5% of the state's 9.9 GW of solar capacity.

Yuma County has 13 power plants of 1 MW or more with 2.4 GW in all; Hyder Solar Hybrid is 2% of that and the 6th largest of 7 solar plants there.

Its capacity factor of 7% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 31
01020304050201920212023202531

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hyder Solar Hybrid (outlined) and other plants in Yuma County, shaded. 33.026, -113.344.

Plant facts

Operator
Arizona Public Service Co
Sector
Electric Utility
Grid operator
AZPS
County
Yuma County, AZ
EIA plant ID
57563
  • Solar32 MW67%
  • Storage16 MW33%
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 17 MW 2011 –
H116M Batteries 16 MW · 48 MWh 2023 –
PV2 Solar Photovoltaic 15 MW 2012 –

Questions

Hyder Solar Hybrid, answered

How much power does Hyder Solar Hybrid produce?

Hyder Solar Hybrid has 48 MW of capacity from 3 generators. In 2025 it generated 31 GWh, 7% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hyder Solar Hybrid power?

Its 2025 output of 31 GWh equals the yearly electricity use of about 2,500 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hyder Solar Hybrid?

Hyder Solar Hybrid is in Yuma County, Arizona, at about 33.026°, -113.344°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Hyder Solar Hybrid?

It is operated by Arizona Public Service Co (EIA sector: Electric Utility), and it feeds Arizona Public Service.

When did Hyder Solar Hybrid open?

Its oldest generator still running came online in 2011.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.