Solar power plant · Yuma, AZ
Hyder Solar Hybrid
Hyder Solar Hybrid is a 48 MW solar power plant in Yuma County, Arizona, operated by Arizona Public Service Co. Its oldest generator still running came online in 2011. In 2025 it generated 31 GWh, about what 2,500 average Arizona homes use in a year.
Hyder Solar Hybrid in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 43rd largest, about 0.5% of the state's 9.9 GW of solar capacity.
Yuma County has 13 power plants of 1 MW or more with 2.4 GW in all; Hyder Solar Hybrid is 2% of that and the 6th largest of 7 solar plants there.
Its capacity factor of 7% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hyder Solar Hybrid (outlined) and other plants in Yuma County, shaded. 33.026, -113.344.
Plant facts
- Operator
- Arizona Public Service Co
- Sector
- Electric Utility
- Grid operator
- AZPS
- County
- Yuma County, AZ
- EIA plant ID
- 57563
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 17 MW | 2011 | – |
| H116M | Batteries | 16 MW · 48 MWh | 2023 | – |
| PV2 | Solar Photovoltaic | 15 MW | 2012 | – |
Questions
Hyder Solar Hybrid, answered
How much power does Hyder Solar Hybrid produce?
Hyder Solar Hybrid has 48 MW of capacity from 3 generators. In 2025 it generated 31 GWh, 7% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hyder Solar Hybrid power?
Its 2025 output of 31 GWh equals the yearly electricity use of about 2,500 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hyder Solar Hybrid?
Hyder Solar Hybrid is in Yuma County, Arizona, at about 33.026°, -113.344°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Hyder Solar Hybrid?
It is operated by Arizona Public Service Co (EIA sector: Electric Utility), and it feeds Arizona Public Service.
When did Hyder Solar Hybrid open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.