Solar power plant · Navajo, AZ

Kayenta Solar Project

Kayenta Solar Project is a 55 MW solar power plant in Navajo County, Arizona, operated by NGI-Kayenta Solar Lessor I, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 121 GWh, about what 9,800 average Arizona homes use in a year.

Capacity55 MWNameplate, September 2026
Generated121 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators2Oldest from 2017

Kayenta Solar Project in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 40th largest, about 0.6% of the state's 9.9 GW of solar capacity.

Navajo County has 5 power plants of 1 MW or more with 711 MW in all; Kayenta Solar Project is 8% of that.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 121
0501001502019202120232025121

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Kayenta Solar Project (outlined) and other plants in Navajo County, shaded. 36.772, -110.264.

Plant facts

Operator
NGI-Kayenta Solar Lessor I, LLC
Sector
IPP Non-CHP
Grid operator
WALC
County
Navajo County, AZ
EIA plant ID
61268
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV2 Solar Photovoltaic 28 MW 2019 –
PV1 Solar Photovoltaic 27 MW 2017 –

Questions

Kayenta Solar Project, answered

How much power does Kayenta Solar Project produce?

Kayenta Solar Project has 55 MW of capacity from 2 generators. In 2025 it generated 121 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Kayenta Solar Project power?

Its 2025 output of 121 GWh equals the yearly electricity use of about 9,800 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Kayenta Solar Project?

Kayenta Solar Project is in Navajo County, Arizona, at about 36.772°, -110.264°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Kayenta Solar Project?

It is operated by NGI-Kayenta Solar Lessor I, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority WALC.

When did Kayenta Solar Project open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.