Solar power plant · Navajo, AZ
Kayenta Solar Project
Kayenta Solar Project is a 55 MW solar power plant in Navajo County, Arizona, operated by NGI-Kayenta Solar Lessor I, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 121 GWh, about what 9,800 average Arizona homes use in a year.
Kayenta Solar Project in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 40th largest, about 0.6% of the state's 9.9 GW of solar capacity.
Navajo County has 5 power plants of 1 MW or more with 711 MW in all; Kayenta Solar Project is 8% of that.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Kayenta Solar Project (outlined) and other plants in Navajo County, shaded. 36.772, -110.264.
Plant facts
- Operator
- NGI-Kayenta Solar Lessor I, LLC
- Sector
- IPP Non-CHP
- Grid operator
- WALC
- County
- Navajo County, AZ
- EIA plant ID
- 61268
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV2 | Solar Photovoltaic | 28 MW | 2019 | – |
| PV1 | Solar Photovoltaic | 27 MW | 2017 | – |
Nearby
Other plants in Navajo County
Questions
Kayenta Solar Project, answered
How much power does Kayenta Solar Project produce?
Kayenta Solar Project has 55 MW of capacity from 2 generators. In 2025 it generated 121 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Kayenta Solar Project power?
Its 2025 output of 121 GWh equals the yearly electricity use of about 9,800 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Kayenta Solar Project?
Kayenta Solar Project is in Navajo County, Arizona, at about 36.772°, -110.264°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Kayenta Solar Project?
It is operated by NGI-Kayenta Solar Lessor I, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority WALC.
When did Kayenta Solar Project open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.