West Camp Wind Farm is a 500 MW wind power plant in Navajo County, Arizona, operated by AES Clean Energy. Its oldest generator still running came online in 2026.

Capacity500 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

West Camp Wind Farm in context

Among the 9 wind plants in Arizona in the EIA's inventory, it is the largest, about 29% of the state's 1.7 GW of wind capacity.

Navajo County has 5 power plants of 1 MW or more with 711 MW in all; West Camp Wind Farm is 70% of that and the largest of 3 wind plants there.

The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

West Camp Wind Farm (outlined) and other plants in Navajo County, shaded. 34.736, -110.425.

Plant facts

Operator
AES Clean Energy
Sector
IPP Non-CHP
Grid operator
AZPS
County
Navajo County, AZ
EIA plant ID
69451
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WCAMP Onshore Wind Turbine 500 MW 2026 –

Questions

West Camp Wind Farm, answered

How much power does West Camp Wind Farm produce?

West Camp Wind Farm has 500 MW of capacity from one generator. No full year of generation is reported yet.

Where is West Camp Wind Farm?

West Camp Wind Farm is in Navajo County, Arizona, at about 34.736°, -110.425°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.

Who operates West Camp Wind Farm?

It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.

When did West Camp Wind Farm open?

Its oldest generator still running came online in 2026.