Wind power plant · Navajo, AZ

Poseidon Wind, LLC

Poseidon Wind, LLC is a 65 MW wind power plant in Navajo County, Arizona, operated by Axium Arizona Renewables, LLC. Its oldest generator still running came online in 2010. In 2025 it generated 104 GWh, about what 8,400 average Arizona homes use in a year.

Capacity65 MWNameplate, September 2026
Generated104 GWhIn 2025
Capacity factor18%Share of the most it could make, 2025
Generators1Oldest from 2010

Poseidon Wind, LLC in context

Among the 9 wind plants in Arizona in the EIA's inventory, it is the 7th largest, about 3.8% of the state's 1.7 GW of wind capacity.

Navajo County has 5 power plants of 1 MW or more with 711 MW in all; Poseidon Wind, LLC is 9% of that and the 2nd largest of 3 wind plants there.

Its capacity factor of 18% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 104
0501001502019202120232025104

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Poseidon Wind, LLC (outlined) and other plants in Navajo County, shaded. 34.606, -110.173.

Plant facts

Operator
Axium Arizona Renewables, LLC
Sector
IPP Non-CHP
Grid operator
AZPS
County
Navajo County, AZ
EIA plant ID
57379
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 65 MW 2010 –

Questions

Poseidon Wind, LLC, answered

How much power does Poseidon Wind, LLC produce?

Poseidon Wind, LLC has 65 MW of capacity from one generator. In 2025 it generated 104 GWh, 18% of the most it could have made running flat out all year (its capacity factor).

How many homes does Poseidon Wind, LLC power?

Its 2025 output of 104 GWh equals the yearly electricity use of about 8,400 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Poseidon Wind, LLC?

Poseidon Wind, LLC is in Navajo County, Arizona, at about 34.606°, -110.173°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Poseidon Wind, LLC?

It is operated by Axium Arizona Renewables, LLC (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.

When did Poseidon Wind, LLC open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.