Biomass power plant · Navajo, AZ
Novo BioPower Plant
Novo BioPower Plant is a 27 MW biomass power plant in Navajo County, Arizona, operated by Novo Biopower LLC. Its oldest generator still running came online in 2008. In 2025 it generated 202 GWh, about what 16,000 average Arizona homes use in a year.
Novo BioPower Plant in context
Among the 4 other-fuel plants in Arizona in the EIA's inventory, it is the largest, about 46% of the state's 60 MW of other-fuel capacity.
Navajo County has 5 power plants of 1 MW or more with 711 MW in all; Novo BioPower Plant is 4% of that.
Its capacity factor of 85% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Novo BioPower Plant (outlined) and other plants in Navajo County, shaded. 34.503, -110.335.
Plant facts
- Operator
- Novo Biopower LLC
- Sector
- IPP Non-CHP
- Grid operator
- AZPS
- County
- Navajo County, AZ
- EIA plant ID
- 56616
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| G3 | Wood/Wood Waste Biomass | 27 MW | 2008 | – |
Nearby
Other plants in Navajo County
Questions
Novo BioPower Plant, answered
How much power does Novo BioPower Plant produce?
Novo BioPower Plant has 27 MW of capacity from one generator. In 2025 it generated 202 GWh, 85% of the most it could have made running flat out all year (its capacity factor).
How many homes does Novo BioPower Plant power?
Its 2025 output of 202 GWh equals the yearly electricity use of about 16,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Novo BioPower Plant?
Novo BioPower Plant is in Navajo County, Arizona, at about 34.503°, -110.335°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Navajo County goes 3.2 hours a year without power, the 2nd most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Novo BioPower Plant?
It is operated by Novo Biopower LLC (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.
When did Novo BioPower Plant open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.