Wind power plant · Carson, TX
Llano Estacado Wind Ranch
Llano Estacado Wind Ranch is a 80 MW wind power plant in Carson County, Texas, operated by Llano Estacado Wind Ranch. Its oldest generator still running came online in 2001. In 2025 it generated 77 GWh, about what 5,800 average Texas homes use in a year.
Llano Estacado Wind Ranch in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 199th largest, about 0.2% of the state's 45 GW of wind capacity.
Carson County has 9 power plants of 1 MW or more with 1.2 GW in all; Llano Estacado Wind Ranch is 7% of that and the 6th largest of 9 wind plants there.
Its capacity factor of 11% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Llano Estacado Wind Ranch (outlined) and other plants in Carson County, shaded. 35.468, -101.253.
Plant facts
- Operator
- Llano Estacado Wind Ranch
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Carson County, TX
- EIA plant ID
- 55579
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| EXIS | Onshore Wind Turbine | 80 MW | 2001 | – |
Questions
Llano Estacado Wind Ranch, answered
How much power does Llano Estacado Wind Ranch produce?
Llano Estacado Wind Ranch has 80 MW of capacity from one generator. In 2025 it generated 77 GWh, 11% of the most it could have made running flat out all year (its capacity factor).
How many homes does Llano Estacado Wind Ranch power?
Its 2025 output of 77 GWh equals the yearly electricity use of about 5,800 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Llano Estacado Wind Ranch?
Llano Estacado Wind Ranch is in Carson County, Texas, at about 35.468°, -101.253°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Llano Estacado Wind Ranch?
It is operated by Llano Estacado Wind Ranch (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Llano Estacado Wind Ranch open?
Its oldest generator still running came online in 2001.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.