Wind power plant · Carson, TX
Majestic 1 Wind Farm
Majestic 1 Wind Farm is a 80 MW wind power plant in Carson County, Texas, operated by NextEra Energy Majestic Wind. Its oldest generator still running came online in 2009. In 2025 it generated 350 GWh, about what 26,000 average Texas homes use in a year.
Majestic 1 Wind Farm in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 203rd largest, about 0.2% of the state's 45 GW of wind capacity.
Carson County has 9 power plants of 1 MW or more with 1.2 GW in all; Majestic 1 Wind Farm is 7% of that and the 8th largest of 9 wind plants there.
Its capacity factor of 50% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Majestic 1 Wind Farm (outlined) and other plants in Carson County, shaded. 35.392, -101.530.
Plant facts
- Operator
- NextEra Energy Majestic Wind
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Carson County, TX
- EIA plant ID
- 56648
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 80 MW | 2009 | – |
Questions
Majestic 1 Wind Farm, answered
How much power does Majestic 1 Wind Farm produce?
Majestic 1 Wind Farm has 80 MW of capacity from one generator. In 2025 it generated 350 GWh, 50% of the most it could have made running flat out all year (its capacity factor).
How many homes does Majestic 1 Wind Farm power?
Its 2025 output of 350 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Majestic 1 Wind Farm?
Majestic 1 Wind Farm is in Carson County, Texas, at about 35.392°, -101.530°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Majestic 1 Wind Farm?
It is operated by NextEra Energy Majestic Wind (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Majestic 1 Wind Farm open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.