Wind power plant · Carson, TX
Majestic II Wind
Majestic II Wind is a 80 MW wind power plant in Carson County, Texas, operated by NextEra Energy Majestic Wind. Its oldest generator still running came online in 2012. In 2025 it generated 180 GWh, about what 13,000 average Texas homes use in a year.
Majestic II Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 202nd largest, about 0.2% of the state's 45 GW of wind capacity.
Carson County has 9 power plants of 1 MW or more with 1.2 GW in all; Majestic II Wind is 7% of that and the 7th largest of 9 wind plants there.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Majestic II Wind (outlined) and other plants in Carson County, shaded. 35.386, -101.579.
Plant facts
- Operator
- NextEra Energy Majestic Wind
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Carson County, TX
- EIA plant ID
- 58363
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WND1 | Onshore Wind Turbine | 80 MW | 2012 | – |
Questions
Majestic II Wind, answered
How much power does Majestic II Wind produce?
Majestic II Wind has 80 MW of capacity from one generator. In 2025 it generated 180 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Majestic II Wind power?
Its 2025 output of 180 GWh equals the yearly electricity use of about 13,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Majestic II Wind?
Majestic II Wind is in Carson County, Texas, at about 35.386°, -101.579°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Majestic II Wind?
It is operated by NextEra Energy Majestic Wind (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Majestic II Wind open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.