Wind power plant · Carson, TX
Pattern Panhandle Wind 2 LLC
Pattern Panhandle Wind 2 LLC is a 182 MW wind power plant in Carson County, Texas, operated by Pattern Operators LP. Its oldest generator still running came online in 2014. In 2025 it generated 577 GWh, about what 43,000 average Texas homes use in a year.
Pattern Panhandle Wind 2 LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 120th largest, about 0.4% of the state's 45 GW of wind capacity.
Carson County has 9 power plants of 1 MW or more with 1.2 GW in all; Pattern Panhandle Wind 2 LLC is 15% of that and the 4th largest of 9 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pattern Panhandle Wind 2 LLC (outlined) and other plants in Carson County, shaded. 35.443, -101.373.
Plant facts
- Operator
- Pattern Operators LP
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Carson County, TX
- EIA plant ID
- 58720
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 182 MW | 2014 | – |
Questions
Pattern Panhandle Wind 2 LLC, answered
How much power does Pattern Panhandle Wind 2 LLC produce?
Pattern Panhandle Wind 2 LLC has 182 MW of capacity from one generator. In 2025 it generated 577 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pattern Panhandle Wind 2 LLC power?
Its 2025 output of 577 GWh equals the yearly electricity use of about 43,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pattern Panhandle Wind 2 LLC?
Pattern Panhandle Wind 2 LLC is in Carson County, Texas, at about 35.443°, -101.373°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Carson County goes 14 hours a year without power, the 84th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Pattern Panhandle Wind 2 LLC?
It is operated by Pattern Operators LP (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Pattern Panhandle Wind 2 LLC open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.