Solar power plant · Brevard, FL

Mallard

Mallard is a 75 MW solar power plant in Brevard County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2026. In 2025 it generated 3.8 GWh, about what 287 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated3.8 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Mallard in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 157th largest, about 0.5% of the state's 14 GW of solar capacity.

Brevard County has 12 power plants of 1 MW or more with 3.7 GW in all; Mallard is 2% of that and the 6th largest of 7 solar plants there.

The average electricity customer in Brevard County goes 4.7 hours a year without power, the 51st most of 67 counties in Florida. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mallard (outlined) and other plants in Brevard County, shaded. 27.832, -80.682.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Brevard County, FL
EIA plant ID
68817
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2026 –

Questions

Mallard, answered

How much power does Mallard produce?

Mallard has 75 MW of capacity from one generator. In 2025 it generated 3.8 GWh.

How many homes does Mallard power?

Its 2025 output of 3.8 GWh equals the yearly electricity use of about 287 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mallard?

Mallard is in Brevard County, Florida, at about 27.832°, -80.682°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Brevard County goes 4.7 hours a year without power, the 51st most of 67 counties in Florida. The county's page has the full outage record.

Who operates Mallard?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Mallard open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.