Solar power plant · Webb, TX

Mars Solar

Mars Solar is a 10 MW solar power plant in Webb County, Texas, operated by Sol Systems. Its oldest generator still running came online in 2019. In 2025 it generated 20 GWh, about what 1,500 average Texas homes use in a year.

Capacity10 MWNameplate, September 2026
Generated20 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2019

Mars Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 193rd largest, about 0.0% of the state's 37 GW of solar capacity.

Webb County has 15 power plants of 1 MW or more with 2.6 GW in all; Mars Solar is 0% of that and the 3rd largest of 3 solar plants there.

Its capacity factor of 23% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020302019202020212022202320242025GWh 20
0102030201920212023202520

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mars Solar (outlined) and other plants in Webb County, shaded. 27.422, -98.835.

Plant facts

Operator
Sol Systems
Sector
IPP Non-CHP
Grid operator
ERCO
County
Webb County, TX
EIA plant ID
63027
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
20 Solar Photovoltaic 10 MW 2019 –

Questions

Mars Solar, answered

How much power does Mars Solar produce?

Mars Solar has 10 MW of capacity from one generator. In 2025 it generated 20 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Mars Solar power?

Its 2025 output of 20 GWh equals the yearly electricity use of about 1,500 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mars Solar?

Mars Solar is in Webb County, Texas, at about 27.422°, -98.835°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Mars Solar?

It is operated by Sol Systems (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Mars Solar open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.