Storage power plant · Cameron, TX
Mesquite Clean Energy Center (BESS)
Mesquite Clean Energy Center (BESS) is a 10 MW storage power plant in Cameron County, Texas, operated by On Energy Storage. Its oldest generator still running came online in 2026.
Mesquite Clean Energy Center (BESS) in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 115th largest, about 0.1% of the state's 16 GW of storage capacity.
Cameron County has 23 power plants of 1 MW or more with 1.6 GW in all; Mesquite Clean Energy Center (BESS) is 1% of that and the 2nd largest of 9 storage plants there.
The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Mesquite Clean Energy Center (BESS) (outlined) and other plants in Cameron County, shaded. 26.098, -97.823.
Plant facts
- Operator
- On Energy Storage
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Cameron County, TX
- EIA plant ID
- 69457
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MEBA1 | Batteries | 10 MW · 20 MWh | 2026 | – |
Questions
Mesquite Clean Energy Center (BESS), answered
How much can Mesquite Clean Energy Center (BESS) store and deliver?
Mesquite Clean Energy Center (BESS) can deliver up to 10 MW and hold 20 MWh of energy, from one battery or storage system.
Where is Mesquite Clean Energy Center (BESS)?
Mesquite Clean Energy Center (BESS) is in Cameron County, Texas, at about 26.098°, -97.823°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Mesquite Clean Energy Center (BESS)?
It is operated by On Energy Storage (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Mesquite Clean Energy Center (BESS) open?
Its oldest generator still running came online in 2026.