Other power plant · Hillsborough, FL
Mosaic Co Tampa Facility
Mosaic Co Tampa Facility is a 72 MW other power plant in Hillsborough County, Florida, operated by Mosaic Company. Its oldest generator still running came online in 1988. In 2025 it generated 87 GWh, about what 6,500 average Florida homes use in a year.
Mosaic Co Tampa Facility in context
Among the 40 other-fuel plants in Florida in the EIA's inventory, it is the 13th largest, about 2.7% of the state's 2.6 GW of other-fuel capacity.
Hillsborough County has 25 power plants of 1 MW or more with 5.1 GW in all; Mosaic Co Tampa Facility is 1% of that and the largest of 4 other plants there.
Its capacity factor of 14% in 2025 is lower than the 25% typical for other plants across the US.
The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mosaic Co Tampa Facility (outlined) and other plants in Hillsborough County, shaded. 27.860, -82.390.
Plant facts
- Operator
- Mosaic Company
- Sector
- Industrial CHP
- Grid operator
- TEC
- County
- Hillsborough County, FL
- EIA plant ID
- 10204
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | All Other | 38 MW | 1988 | – |
| GEN3 | All Other | 35 MW | 1999 | – |
Questions
Mosaic Co Tampa Facility, answered
How much power does Mosaic Co Tampa Facility produce?
Mosaic Co Tampa Facility has 72 MW of capacity from 2 generators. In 2025 it generated 87 GWh, 14% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mosaic Co Tampa Facility power?
Its 2025 output of 87 GWh equals the yearly electricity use of about 6,500 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mosaic Co Tampa Facility?
Mosaic Co Tampa Facility is in Hillsborough County, Florida, at about 27.860°, -82.390°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Mosaic Co Tampa Facility?
It is operated by Mosaic Company (EIA sector: Industrial CHP), and it feeds balancing authority TEC.
When did Mosaic Co Tampa Facility open?
Its oldest generator still running came online in 1988.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.