Solar power plant · Milam, TX

Orion I Solar Project

Orion I Solar Project is a 200 MW solar power plant in Milam County, Texas, operated by Ben Milam Solar 1 LLC. Its oldest generator still running came online in 2024. In 2025 it generated 446 GWh, about what 33,000 average Texas homes use in a year.

Capacity200 MWNameplate, September 2026
Generated446 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2024

Orion I Solar Project in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 90th largest, about 0.5% of the state's 37 GW of solar capacity.

Milam County has 7 power plants of 1 MW or more with 1.2 GW in all; Orion I Solar Project is 17% of that and the 4th largest of 7 solar plants there.

Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020242025GWh 446
010020030040050020242025446

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Orion I Solar Project (outlined) and other plants in Milam County, shaded. 30.997, -97.002.

Plant facts

Operator
Ben Milam Solar 1 LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Milam County, TX
EIA plant ID
66859
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ORN1 Solar Photovoltaic 200 MW 2024 –

Questions

Orion I Solar Project, answered

How much power does Orion I Solar Project produce?

Orion I Solar Project has 200 MW of capacity from one generator. In 2025 it generated 446 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Orion I Solar Project power?

Its 2025 output of 446 GWh equals the yearly electricity use of about 33,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Orion I Solar Project?

Orion I Solar Project is in Milam County, Texas, at about 30.997°, -97.002°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Orion I Solar Project?

It is operated by Ben Milam Solar 1 LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Orion I Solar Project open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.