Solar power plant · Milam, TX
Stoneridge Solar, LLC
Stoneridge Solar, LLC is a 200 MW solar power plant in Milam County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 257 GWh, about what 19,000 average Texas homes use in a year.
Stoneridge Solar, LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 92nd largest, about 0.5% of the state's 37 GW of solar capacity.
Milam County has 7 power plants of 1 MW or more with 1.2 GW in all; Stoneridge Solar, LLC is 17% of that and the 5th largest of 7 solar plants there.
The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Stoneridge Solar, LLC (outlined) and other plants in Milam County, shaded. 30.569, -97.110.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Milam County, TX
- EIA plant ID
- 69027
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SSPV | Solar Photovoltaic | 200 MW | 2025 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| SSBA | Batteries | 100 MW | 2026 |
Questions
Stoneridge Solar, LLC, answered
How much power does Stoneridge Solar, LLC produce?
Stoneridge Solar, LLC has 200 MW of capacity from one generator. In 2025 it generated 257 GWh.
How many homes does Stoneridge Solar, LLC power?
Its 2025 output of 257 GWh equals the yearly electricity use of about 19,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Stoneridge Solar, LLC?
Stoneridge Solar, LLC is in Milam County, Texas, at about 30.569°, -97.110°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Stoneridge Solar, LLC?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Stoneridge Solar, LLC open?
Its oldest generator still running came online in 2025. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.