Solar power plant · Milam, TX

Yaupon Solar Project (Hybrid)

Yaupon Solar Project (Hybrid) is a 200 MW solar power plant in Milam County, Texas, operated by Yaupon Solar, LLC. Its oldest generator still running came online in 2026.

Capacity200 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Yaupon Solar Project (Hybrid) in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 88th largest, about 0.5% of the state's 37 GW of solar capacity.

Milam County has 7 power plants of 1 MW or more with 1.2 GW in all; Yaupon Solar Project (Hybrid) is 17% of that and the 3rd largest of 7 solar plants there.

The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Yaupon Solar Project (Hybrid) (outlined) and other plants in Milam County, shaded. 31.044, -96.851.

Plant facts

Operator
Yaupon Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Milam County, TX
EIA plant ID
66216
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SOL Solar Photovoltaic 200 MW 2026 –

Planned

GeneratorTechnologyCapacityExpected
BESSBatteries100 MW2027

Questions

Yaupon Solar Project (Hybrid), answered

How much power does Yaupon Solar Project (Hybrid) produce?

Yaupon Solar Project (Hybrid) has 200 MW of capacity from one generator. No full year of generation is reported yet.

Where is Yaupon Solar Project (Hybrid)?

Yaupon Solar Project (Hybrid) is in Milam County, Texas, at about 31.044°, -96.851°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Yaupon Solar Project (Hybrid)?

It is operated by Yaupon Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Yaupon Solar Project (Hybrid) open?

Its oldest generator still running came online in 2026. 1 more generator is planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.