Solar power plant · Milam, TX
Orion III Solar Project
Orion III Solar Project is a 250 MW solar power plant in Milam County, Texas, operated by Ben Milam Solar 3 LLC. Its oldest generator still running came online in 2024. In 2025 it generated 552 GWh, about what 41,000 average Texas homes use in a year.
Orion III Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 51st largest, about 0.7% of the state's 37 GW of solar capacity.
Milam County has 7 power plants of 1 MW or more with 1.2 GW in all; Orion III Solar Project is 21% of that and the largest of 7 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Orion III Solar Project (outlined) and other plants in Milam County, shaded. 30.960, -97.125.
Plant facts
- Operator
- Ben Milam Solar 3 LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Milam County, TX
- EIA plant ID
- 66821
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ORN3 | Solar Photovoltaic | 250 MW | 2024 | – |
Questions
Orion III Solar Project, answered
How much power does Orion III Solar Project produce?
Orion III Solar Project has 250 MW of capacity from one generator. In 2025 it generated 552 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Orion III Solar Project power?
Its 2025 output of 552 GWh equals the yearly electricity use of about 41,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Orion III Solar Project?
Orion III Solar Project is in Milam County, Texas, at about 30.960°, -97.125°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Milam County goes 15 hours a year without power, the 72nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Orion III Solar Project?
It is operated by Ben Milam Solar 3 LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Orion III Solar Project open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.