Wind power plant · Kenedy, TX
Pattern Gulf Wind
Pattern Gulf Wind is a 283 MW wind power plant in Kenedy County, Texas, operated by Pattern Operators LP. Its oldest generator still running came online in 2008. In 2025 it generated 759 GWh, about what 57,000 average Texas homes use in a year.
Pattern Gulf Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 38th largest, about 0.6% of the state's 45 GW of wind capacity.
Kenedy County has 5 power plants of 1 MW or more with 1.1 GW in all; Pattern Gulf Wind is 26% of that and the largest of 5 wind plants there.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Kenedy County goes 46 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pattern Gulf Wind (outlined) and other plants in Kenedy County, shaded. 27.001, -97.599.
Plant facts
- Operator
- Pattern Operators LP
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Kenedy County, TX
- EIA plant ID
- 56661
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 283 MW | 2008 | – |
Nearby
Other plants in Kenedy County
Questions
Pattern Gulf Wind, answered
How much power does Pattern Gulf Wind produce?
Pattern Gulf Wind has 283 MW of capacity from one generator. In 2025 it generated 759 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pattern Gulf Wind power?
Its 2025 output of 759 GWh equals the yearly electricity use of about 57,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pattern Gulf Wind?
Pattern Gulf Wind is in Kenedy County, Texas, at about 27.001°, -97.599°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Kenedy County goes 46 hours a year without power. The county's page has the full outage record.
Who operates Pattern Gulf Wind?
It is operated by Pattern Operators LP (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Pattern Gulf Wind open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.