Wind power plant · Kenedy, TX

Penascal Wind Power LLC

Penascal Wind Power LLC is a 202 MW wind power plant in Kenedy County, Texas, operated by Avangrid Power LLC. Its oldest generator still running came online in 2009. In 2025 it generated 298 GWh, about what 22,000 average Texas homes use in a year.

Capacity202 MWNameplate, September 2026
Generated298 GWhIn 2025
Capacity factor17%Share of the most it could make, 2025
Generators1Oldest from 2009

Penascal Wind Power LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 86th largest, about 0.4% of the state's 45 GW of wind capacity.

Kenedy County has 5 power plants of 1 MW or more with 1.1 GW in all; Penascal Wind Power LLC is 19% of that and the 3rd largest of 5 wind plants there.

Its capacity factor of 17% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Kenedy County goes 46 hours a year without power. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 298
02004006008002019202120232025298

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Penascal Wind Power LLC (outlined) and other plants in Kenedy County, shaded. 27.022, -97.498.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Kenedy County, TX
EIA plant ID
56795
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 202 MW 2009 –

Questions

Penascal Wind Power LLC, answered

How much power does Penascal Wind Power LLC produce?

Penascal Wind Power LLC has 202 MW of capacity from one generator. In 2025 it generated 298 GWh, 17% of the most it could have made running flat out all year (its capacity factor).

How many homes does Penascal Wind Power LLC power?

Its 2025 output of 298 GWh equals the yearly electricity use of about 22,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Penascal Wind Power LLC?

Penascal Wind Power LLC is in Kenedy County, Texas, at about 27.022°, -97.498°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Kenedy County goes 46 hours a year without power. The county's page has the full outage record.

Who operates Penascal Wind Power LLC?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Penascal Wind Power LLC open?

Its oldest generator still running came online in 2009.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.