Wind power plant · Kenedy, TX

Penascal II Wind Project LLC

Penascal II Wind Project LLC is a 202 MW wind power plant in Kenedy County, Texas, operated by Avangrid Power LLC. Its oldest generator still running came online in 2010. In 2025 it generated 286 GWh, about what 21,000 average Texas homes use in a year.

Capacity202 MWNameplate, September 2026
Generated286 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators1Oldest from 2010

Penascal II Wind Project LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 87th largest, about 0.4% of the state's 45 GW of wind capacity.

Kenedy County has 5 power plants of 1 MW or more with 1.1 GW in all; Penascal II Wind Project LLC is 19% of that and the 4th largest of 5 wind plants there.

Its capacity factor of 16% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Kenedy County goes 46 hours a year without power. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060020182019202020212022202320242025GWh 286
02004006002019202120232025286

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Penascal II Wind Project LLC (outlined) and other plants in Kenedy County, shaded. 27.123, -97.557.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Kenedy County, TX
EIA plant ID
57095
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 202 MW 2010 –

Questions

Penascal II Wind Project LLC, answered

How much power does Penascal II Wind Project LLC produce?

Penascal II Wind Project LLC has 202 MW of capacity from one generator. In 2025 it generated 286 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does Penascal II Wind Project LLC power?

Its 2025 output of 286 GWh equals the yearly electricity use of about 21,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Penascal II Wind Project LLC?

Penascal II Wind Project LLC is in Kenedy County, Texas, at about 27.123°, -97.557°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Kenedy County goes 46 hours a year without power. The county's page has the full outage record.

Who operates Penascal II Wind Project LLC?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Penascal II Wind Project LLC open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.