Geothermal power plant · Churchill, NV
Patua Acquisition Project, LLC
Patua Acquisition Project, LLC is a 59 MW geothermal power plant in Churchill County, Nevada, operated by Patua Acquisition Company, LLC. Its oldest generator still running came online in 2013. In 2025 it generated 103 GWh, about what 9,900 average Nevada homes use in a year.
Patua Acquisition Project, LLC in context
Among the 30 other-fuel plants in Nevada in the EIA's inventory, it is the 6th largest, about 5.7% of the state's 1.0 GW of other-fuel capacity.
Churchill County has 11 power plants of 1 MW or more with 778 MW in all; Patua Acquisition Project, LLC is 8% of that and the 4th largest of 7 geothermal plants there.
Its capacity factor of 20% in 2025 is lower than the 25% typical for geothermal plants across the US.
The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Patua Acquisition Project, LLC (outlined) and other plants in Churchill County, shaded. 39.586, -119.073.
Plant facts
- Operator
- Patua Acquisition Company, LLC
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Churchill County, NV
- EIA plant ID
- 58319
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Geothermal | 16 MW | 2013 | – |
| 3 | Geothermal | 16 MW | 2013 | – |
| 5 | Geothermal | 16 MW | 2013 | – |
| PV-01 | Solar Photovoltaic | 11 MW | 2017 | – |
Questions
Patua Acquisition Project, LLC, answered
How much power does Patua Acquisition Project, LLC produce?
Patua Acquisition Project, LLC has 59 MW of capacity from 4 generators. In 2025 it generated 103 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Patua Acquisition Project, LLC power?
Its 2025 output of 103 GWh equals the yearly electricity use of about 9,900 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Patua Acquisition Project, LLC?
Patua Acquisition Project, LLC is in Churchill County, Nevada, at about 39.586°, -119.073°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Patua Acquisition Project, LLC?
It is operated by Patua Acquisition Company, LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did Patua Acquisition Project, LLC open?
Its oldest generator still running came online in 2013.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.