Geothermal power plant · Churchill, NV
Tungsten Mountain
Tungsten Mountain is a 75 MW geothermal power plant in Churchill County, Nevada, operated by Tungsten Mountain. Its oldest generator still running came online in 2017. In 2025 it generated 277 GWh, about what 27,000 average Nevada homes use in a year.
Tungsten Mountain in context
Among the 30 other-fuel plants in Nevada in the EIA's inventory, it is the 3rd largest, about 7.3% of the state's 1.0 GW of other-fuel capacity.
Churchill County has 11 power plants of 1 MW or more with 778 MW in all; Tungsten Mountain is 10% of that and the largest of 7 geothermal plants there.
Its capacity factor of 42% in 2025 is higher than the 25% typical for geothermal plants across the US.
The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tungsten Mountain (outlined) and other plants in Churchill County, shaded. 39.667, -117.694.
Plant facts
- Operator
- Tungsten Mountain
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Churchill County, NV
- EIA plant ID
- 60785
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| UNIT1 | Geothermal | 37 MW | 2017 | – |
| OEC2 | Geothermal | 26 MW | 2022 | – |
| TMSOL | Solar Photovoltaic | 7.3 MW | 2019 | – |
| TMSL2 | Solar Photovoltaic | 5.0 MW | 2023 | – |
Questions
Tungsten Mountain, answered
How much power does Tungsten Mountain produce?
Tungsten Mountain has 75 MW of capacity from 4 generators. In 2025 it generated 277 GWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tungsten Mountain power?
Its 2025 output of 277 GWh equals the yearly electricity use of about 27,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tungsten Mountain?
Tungsten Mountain is in Churchill County, Nevada, at about 39.667°, -117.694°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Tungsten Mountain?
It is operated by Tungsten Mountain (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did Tungsten Mountain open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.