Solar power plant · Churchill, NV

Stillwater Solar PV II

Stillwater Solar PV II is a 20 MW solar power plant in Churchill County, Nevada, operated by Ormat Stillwater Solar PV II, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 12 GWh, about what 1,200 average Nevada homes use in a year.

Capacity20 MWNameplate, September 2026
Generated12 GWhIn 2025
Capacity factor7%Share of the most it could make, 2025
Generators1Oldest from 2018

Stillwater Solar PV II in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 38th largest, about 0.3% of the state's 6.2 GW of solar capacity.

Churchill County has 11 power plants of 1 MW or more with 778 MW in all; Stillwater Solar PV II is 3% of that.

Its capacity factor of 7% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 12
01020304050201920212023202512

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Stillwater Solar PV II (outlined) and other plants in Churchill County, shaded. 39.542, -118.560.

Plant facts

Operator
Ormat Stillwater Solar PV II, LLC
Sector
IPP Non-CHP
Grid operator
NEVP
County
Churchill County, NV
EIA plant ID
61809
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
STWII Solar Photovoltaic 20 MW 2018 –

Questions

Stillwater Solar PV II, answered

How much power does Stillwater Solar PV II produce?

Stillwater Solar PV II has 20 MW of capacity from one generator. In 2025 it generated 12 GWh, 7% of the most it could have made running flat out all year (its capacity factor).

How many homes does Stillwater Solar PV II power?

Its 2025 output of 12 GWh equals the yearly electricity use of about 1,200 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Stillwater Solar PV II?

Stillwater Solar PV II is in Churchill County, Nevada, at about 39.542°, -118.560°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Stillwater Solar PV II?

It is operated by Ormat Stillwater Solar PV II, LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Stillwater Solar PV II open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.