Storage power plant · Churchill, NV
Sierra Solar Hybrid
Sierra Solar Hybrid is a 400 MW storage power plant in Churchill County, Nevada, operated by Sierra Pacific Power Co. Its oldest generator still running came online in 2026.
Sierra Solar Hybrid in context
Among the 5 storage plants in Nevada in the EIA's inventory, it is the largest, about 36% of the state's 1.1 GW of storage capacity.
Churchill County has 11 power plants of 1 MW or more with 778 MW in all; Sierra Solar Hybrid is 51% of that.
The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.
Where it is
Sierra Solar Hybrid (outlined) and other plants in Churchill County, shaded. 39.854, -119.039.
Plant facts
- Operator
- Sierra Pacific Power Co
- Sector
- Electric Utility
- Grid operator
- NEVP
- County
- Churchill County, NV
- EIA plant ID
- 67978
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SSES1 | Batteries | 400 MW · 1,600 MWh | 2026 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| SSPV1 | Solar Photovoltaic | 400 MW | 2026 |
Questions
Sierra Solar Hybrid, answered
How much can Sierra Solar Hybrid store and deliver?
Sierra Solar Hybrid can deliver up to 400 MW and hold 1,600 MWh of energy, from one battery or storage system.
Where is Sierra Solar Hybrid?
Sierra Solar Hybrid is in Churchill County, Nevada, at about 39.854°, -119.039°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Churchill County goes 2.8 hours a year without power, the 9th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Sierra Solar Hybrid?
It is operated by Sierra Pacific Power Co (EIA sector: Electric Utility), and it feeds NV Energy.
When did Sierra Solar Hybrid open?
Its oldest generator still running came online in 2026. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.