Solar power plant · Pecos, TX

Pearl Solar

Pearl Solar is a 50 MW solar power plant in Pecos County, Texas, operated by BHE Renewables, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 97 GWh, about what 7,300 average Texas homes use in a year.

Capacity50 MWNameplate, September 2026
Generated97 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators1Oldest from 2017

Pearl Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 160th largest, about 0.1% of the state's 37 GW of solar capacity.

Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Pearl Solar is 1% of that and the 12th largest of 13 solar plants there.

Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 97
050100150201920212023202597

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Pearl Solar (outlined) and other plants in Pecos County, shaded. 30.988, -102.268.

Plant facts

Operator
BHE Renewables, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Pecos County, TX
EIA plant ID
60682
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PEARL Solar Photovoltaic 50 MW 2017 –

Questions

Pearl Solar, answered

How much power does Pearl Solar produce?

Pearl Solar has 50 MW of capacity from one generator. In 2025 it generated 97 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does Pearl Solar power?

Its 2025 output of 97 GWh equals the yearly electricity use of about 7,300 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Pearl Solar?

Pearl Solar is in Pecos County, Texas, at about 30.988°, -102.268°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Pearl Solar?

It is operated by BHE Renewables, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Pearl Solar open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.