Natural gas power plant · Putnam, FL
Seminole (FL)
Seminole (FL) is a 1.9 GW natural gas power plant in Putnam County, Florida, operated by Seminole Electric Cooperative Inc. Its oldest generator still running came online in 1984. In 2025 it generated 10 TWh, about what 771,000 average Florida homes use in a year.
Seminole (FL) in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 10th largest, about 3.4% of the state's 56 GW of natural gas capacity.
Putnam County has 9 power plants of 1 MW or more with 2.5 GW in all; Seminole (FL) is 76% of that.
Its capacity factor of 61% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Putnam County goes 5.5 hours a year without power, the 45th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Seminole (FL) (outlined) and other plants in Putnam County, shaded. 29.733, -81.633.
Plant facts
- Operator
- Seminole Electric Cooperative Inc
- Sector
- Electric Utility
- Grid operator
- SEC
- County
- Putnam County, FL
- EIA plant ID
- 136
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 2 | Conventional Steam Coal | 715 MW | 1984 | – |
| ST | Natural Gas Fired Combined Cycle | 415 MW | 2023 | – |
| CT1 | Natural Gas Fired Combined Cycle | 384 MW | 2023 | – |
| CT2 | Natural Gas Fired Combined Cycle | 384 MW | 2023 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | 715 MW | 1984 | 2024 |
Questions
Seminole (FL), answered
How much power does Seminole (FL) produce?
Seminole (FL) has 1.9 GW of capacity from 4 generators. In 2025 it generated 10 TWh, 61% of the most it could have made running flat out all year (its capacity factor).
How many homes does Seminole (FL) power?
Its 2025 output of 10 TWh equals the yearly electricity use of about 771,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Seminole (FL)?
Seminole (FL) is in Putnam County, Florida, at about 29.733°, -81.633°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Putnam County goes 5.5 hours a year without power, the 45th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Seminole (FL)?
It is operated by Seminole Electric Cooperative Inc (EIA sector: Electric Utility), and it feeds balancing authority SEC.
When did Seminole (FL) open?
Its oldest generator still running came online in 1984.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.