Solar power plant · Putnam, FL
Tupelo Solar
Tupelo Solar is a 75 MW solar power plant in Putnam County, Florida, operated by FRP Tupelo Solar, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 191 GWh, about what 14,000 average Florida homes use in a year.
Tupelo Solar in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 145th largest, about 0.5% of the state's 14 GW of solar capacity.
Putnam County has 9 power plants of 1 MW or more with 2.5 GW in all; Tupelo Solar is 3% of that and the 7th largest of 7 solar plants there.
Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Putnam County goes 5.5 hours a year without power, the 45th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tupelo Solar (outlined) and other plants in Putnam County, shaded. 29.604, -81.527.
Plant facts
- Operator
- FRP Tupelo Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- FPL
- County
- Putnam County, FL
- EIA plant ID
- 67182
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TUPS | Solar Photovoltaic | 75 MW | 2024 | – |
Questions
Tupelo Solar, answered
How much power does Tupelo Solar produce?
Tupelo Solar has 75 MW of capacity from one generator. In 2025 it generated 191 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tupelo Solar power?
Its 2025 output of 191 GWh equals the yearly electricity use of about 14,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tupelo Solar?
Tupelo Solar is in Putnam County, Florida, at about 29.604°, -81.527°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Putnam County goes 5.5 hours a year without power, the 45th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Tupelo Solar?
It is operated by FRP Tupelo Solar, LLC (EIA sector: IPP Non-CHP), and it feeds Florida Power & Light.
When did Tupelo Solar open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.