Storage power plant · Webb, TX

Seven Flags BESS LLC

Seven Flags BESS LLC is a 100 MW storage power plant in Webb County, Texas, operated by Seven Flags BESS LLC. Its oldest generator still running came online in 2026.

Capacity100 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Seven Flags BESS LLC in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 76th largest, about 0.6% of the state's 16 GW of storage capacity.

Webb County has 15 power plants of 1 MW or more with 2.6 GW in all; Seven Flags BESS LLC is 4% of that and the 3rd largest of 3 storage plants there.

The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Seven Flags BESS LLC (outlined) and other plants in Webb County, shaded. 27.456, -99.417.

Plant facts

Operator
Seven Flags BESS LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Webb County, TX
EIA plant ID
66689
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
7FLAG Batteries 100 MW · 200 MWh 2026 –

Questions

Seven Flags BESS LLC, answered

How much can Seven Flags BESS LLC store and deliver?

Seven Flags BESS LLC can deliver up to 100 MW and hold 200 MWh of energy, from one battery or storage system.

Where is Seven Flags BESS LLC?

Seven Flags BESS LLC is in Webb County, Texas, at about 27.456°, -99.417°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Seven Flags BESS LLC?

It is operated by Seven Flags BESS LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Seven Flags BESS LLC open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.