Wind power plant · Pecos, TX
Sherbino II
Sherbino II is a 132 MW wind power plant in Pecos County, Texas, operated by Sherbino II Wind Farm LLC. Its oldest generator still running came online in 2011. In 2025 it generated 539 GWh, about what 40,000 average Texas homes use in a year.
Sherbino II in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 169th largest, about 0.3% of the state's 45 GW of wind capacity.
Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Sherbino II is 4% of that and the 2nd largest of 5 wind plants there.
Its capacity factor of 47% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sherbino II (outlined) and other plants in Pecos County, shaded. 30.773, -102.506.
Plant facts
- Operator
- Sherbino II Wind Farm LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Pecos County, TX
- EIA plant ID
- 57415
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 132 MW | 2011 | – |
Questions
Sherbino II, answered
How much power does Sherbino II produce?
Sherbino II has 132 MW of capacity from one generator. In 2025 it generated 539 GWh, 47% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sherbino II power?
Its 2025 output of 539 GWh equals the yearly electricity use of about 40,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sherbino II?
Sherbino II is in Pecos County, Texas, at about 30.773°, -102.506°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Sherbino II?
It is operated by Sherbino II Wind Farm LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Sherbino II open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.