Storage power plant · Cameron, TX
SMT Los Fresnos LLC
SMT Los Fresnos LLC is a 10 MW storage power plant in Cameron County, Texas, operated by SMT Los Fresnos LLC. Its oldest generator still running came online in 2023.
SMT Los Fresnos LLC in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 124th largest, about 0.1% of the state's 16 GW of storage capacity.
Cameron County has 23 power plants of 1 MW or more with 1.6 GW in all; SMT Los Fresnos LLC is 1% of that and the 4th largest of 9 storage plants there.
The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
SMT Los Fresnos LLC (outlined) and other plants in Cameron County, shaded. 26.075, -97.523.
Plant facts
- Operator
- SMT Los Fresnos LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Cameron County, TX
- EIA plant ID
- 66932
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SMTLF | Batteries | 10 MW · 10 MWh | 2023 | – |
Questions
SMT Los Fresnos LLC, answered
How much can SMT Los Fresnos LLC store and deliver?
SMT Los Fresnos LLC can deliver up to 10 MW and hold 10 MWh of energy, from one battery or storage system. Its net energy in 2025 was -0.2 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is SMT Los Fresnos LLC?
SMT Los Fresnos LLC is in Cameron County, Texas, at about 26.075°, -97.523°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Who operates SMT Los Fresnos LLC?
It is operated by SMT Los Fresnos LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did SMT Los Fresnos LLC open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Methodology.