Solar power plant · Brevard, FL

Space Coast Next Gen Solar Energy

Space Coast Next Gen Solar Energy is a 10 MW solar power plant in Brevard County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2010. In 2025 it generated 11 GWh, about what 793 average Florida homes use in a year.

Capacity10 MWNameplate, September 2026
Generated11 GWhIn 2025
Capacity factor12%Share of the most it could make, 2025
Generators1Oldest from 2010

Space Coast Next Gen Solar Energy in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 189th largest, about 0.1% of the state's 14 GW of solar capacity.

Brevard County has 12 power plants of 1 MW or more with 3.7 GW in all; Space Coast Next Gen Solar Energy is 0% of that and the 7th largest of 7 solar plants there.

Its capacity factor of 12% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Brevard County goes 4.7 hours a year without power, the 51st most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0510152020182019202020212022202320242025GWh 11
05101520201920212023202511

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Space Coast Next Gen Solar Energy (outlined) and other plants in Brevard County, shaded. 28.459, -80.681.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Brevard County, FL
EIA plant ID
56930
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 10 MW 2010 –

Questions

Space Coast Next Gen Solar Energy, answered

How much power does Space Coast Next Gen Solar Energy produce?

Space Coast Next Gen Solar Energy has 10 MW of capacity from one generator. In 2025 it generated 11 GWh, 12% of the most it could have made running flat out all year (its capacity factor).

How many homes does Space Coast Next Gen Solar Energy power?

Its 2025 output of 11 GWh equals the yearly electricity use of about 793 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Space Coast Next Gen Solar Energy?

Space Coast Next Gen Solar Energy is in Brevard County, Florida, at about 28.459°, -80.681°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Brevard County goes 4.7 hours a year without power, the 51st most of 67 counties in Florida. The county's page has the full outage record.

Who operates Space Coast Next Gen Solar Energy?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Space Coast Next Gen Solar Energy open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.